- Location : Land No 310 Bongsan-ri Boseong-eup
- Project Expenses : 5,505,000KRW (700,000KRW in 2005, 1,703,000KRW in 2006 and 3,102,000KRW in 2007)
- Size of Site : 13,862㎡
- Structure Size : 2,149㎡
- Processing Plant : 1,852㎡
Main Facility
- Processing Plant: tea processing facility(120kg/h line, 680kg/h line)
- Subsidiary Facility: low temperature storage, product packing room, product shipping site, etc
- Convenient Facility: Office(1 and 2 floors), tour room(2 floor), WC, etc
Daily Throughput (Freshly Picked Leaves)
- 120kg/h line: 1.2 ton
- 680kg/h line: 6.8 ton
- Capable to processing total dry leaves of 130 ton annually.
Operation
- Selection of a company specialized in processing green tea → Outsourcing
- Batch operation from fresh-picked tea leaf process to products sales
Date to Launch
- Operation: from May 2009.